Existing gridAdded electrodesNot to scale

Grounding and bonding

Grounding grid upgrade.

A grounding upgrade at an industrial process facility in Tulsa, Oklahoma, after routine testing flagged its grid.

Location
Tulsa, OK
Building type
Industrial process facility
01Scope
Routine testing showed the facility's grounding grid performing outside its acceptable range. The job was to bring its ground resistance down.
02The challenge
The soil on site limited what standard electrode spacing could achieve. The grid needed an expanded electrode layout.
03Work performed
We designed an expanded ground electrode and bonding layout and installed it. The new layout ties into the existing grid. We then tested again to confirm its performance.
04Result
Ground resistance is now within the target range. The figures are documented in the facility's electrical records.
A conductor runs across a white low-slope roof past two air terminalsAir terminalConductorNext projectAmazon distribution facilityBatesville, AR

Request an estimate.

Tell us about the building and the scope.

Attach plans or photos to the email before you send it.